1. cement silo body before installing the equipment two based on the scene with elevation leveling, for the same silo based fulcrum error should be low pad high processing according to the highest point elevation, the ultimate goal is to ensure that the vertical cement silo body center position, its central axis may tilt.
2. cement silo body in the delivery of the set of process support, installation should be pre removed. 3. cement silo body assembly parts should be carried out in horizontal, there shall be no staff activities in the silo body erected anchor bolt fixed before the chamber body, in order to avoid danger.
4.storage bin, batching bin due to the feeding position and climbing ladder position limit, two equipment relative to the basic position is slightly different, should pay attention to the installation.
5. part of the electrical system in cement silo vibration motor are used to secure operating voltage of DC24V, but in the wiring and maintenance are not charged operation, so as to avoid the occurrence of short circuit fault caused by burning components during operation.